Difference between revisions of "start time"

From PST AG
Jump to: navigation, search
(‎Changed a property: PST.AG)
(‎Changed a property: PST.AG)
property / OpenStreetMap tag or key
 +
Key:start_date
property / OpenStreetMap tag or key: Key:start_date / rank
 +
Normal rank

Revision as of 15:19, 5 January 2018

indicates the time an item begins to exist or a statement starts being valid
  • from
  • starting
  • began
  • from time
  • since
  • from date
  • start date
  • building date
  • starttime
  • introduced
  • introduction
  • started in
  • beginning
edit
Language Label Description Also known as
English
start time
indicates the time an item begins to exist or a statement starts being valid
  • from
  • starting
  • began
  • from time
  • since
  • from date
  • start date
  • building date
  • starttime
  • introduced
  • introduction
  • started in
  • beginning

Data type

Point in time

Statements

0 references
0 references
0 references
Key:start_date
0 references